Frame Drive bridge Abermain, load limit reduced to five tonnes

August 27 2014 - 8:30am
Cessnock City Council has further reduced the load limit on the Frame Drive bridge at Abermain.
Cessnock City Council has further reduced the load limit on the Frame Drive bridge at Abermain.

Cessnock City Council has further reduced the load limit on the Frame Drive bridge at Abermain.

Subscribe now for unlimited access.

$0/

(min cost $0)

or signup to continue reading

See subscription options